Village & Farm Milling Service
The problem
You want to mill for the surrounding farms but have no building, limited power and no trained staff.
The answer
A single-frame 6FSZ unit that arrives assembled. Three-phase power, a poured slab and two days of commissioning.
Key figures
- Capital
- Lowest in the range
- Power
- 10.45–16.5 kW
- Staff
- 1
- Payback
- 1–2 years